Campus Projects Environmental Impact Reports

Below are Project and Facilities Master Plan Environmental Impact Reports with supporting documentation where available. Additional reports will be made available as they are created.

Facilities Master Plan (2017)

In addition to the final report and appendices, below is the draft report and meeting overviews from campus and community forums.

Following the passage of Measure J, Fullerton College embarked upon a comprehensive planning process that determined the location and sequencing of building and renovation projects on its campus. As an initial step in this planning, the college sought input from the campus community and the community at-large at a series of open forums. The first forums were held in the spring of 2015. In October 2015, architects presented findings and recommendations from the previous open forums. Guests had an opportunity to ask questions and share their input about proposed building locations and the sequencing of projects.

Sherbeck Field (2019)

A Public Hearing for the Sherbeck Field Improvements Project Final Environmental Impact Report was held at the North Orange County Community College District meeting on October 22, 2019. 

 The proposed project encompasses the installation of permanent prefabricated aluminum bleachers, six field lighting stanchions, a new sound system, press box and storage building at the existing Sherbeck Field. Sherbeck Field would continue to be used for academic instruction, competitive athletics, and rentals; however, Sherbeck Field is proposed to host competitive football games, which are currently held at other locations. The inclusion of field lighting as part of the project would allow Fullerton College to add more evening classes, to offer a balanced schedule, and provide more class options for students who may not be able to take physical education during the day.

 

Document Links

 

October 2019 Final Environmental Impact Report Prepared by Dudek→

This document incorporates an updated table of contents and five additional figures shown in appendix B. The first document was posted on October 11, 2019, and the updated version was posted on October 24, 2019.

November 2019 Resolution 19/20-12 Exhibit A →
Findings of Fact for the Sherbeck Field Improvements Project Final Environmental Impact Report SCH No. 2018041025 Pursuant to Sections 21081, 21081.5, and 21081.6 of the Public Resources Code and Sections 15091 and 15093 of the CEQA Guidelines.

Resolution 19/20-12 Exhibit B→
Chapter 4 Mitigation Monitoring and Reporting Program

Resolution 19/20-14 Exhibit A→ 
Findings of Fact for the Sherbeck Field Improvements Project

Resolution 19/20-14 Exhibit B→
Mitigation Monitoring and Reporting Program

May 2019 Draft Environmental Impact Report→

NOA Letter→
Notice of Availability of a Draft Environmental Impact Report for the Fullerton College Sherbeck Field Improvements Project

Appendix A→
Initial Study/NOP

Appendix B→
NOP Comment Summary Table and NOP Comment Letters

Appendix C→
Illumination Summary

Appendix D→
AQ and GHG Emissions Modeling

Appendix E→
Noise Modeling

Appendix F→
Traffic Impact Report

Appendix F_Appx A-F→

Appendix F_Appx G-O→

Appendix G→
Cultural Resources Report

Appendix H→
Preliminary Drainage Plans

April 2018 Initial Study

NOP Letter→

Initial Study EIR→