COMPLETED PROJECTS

Sherbeck Field Improvement

Sherbeck field completed bleacher and lighting installation rendering used for EIR draft published May 15, 2019. Source: GLR Group, 2018.

Project Overview

The proposed project encompasses the installation of permanent prefabricated aluminum bleachers, six field lighting stanchions, a new sound system, press box and storage building at the existing Sherbeck Field. Sherbeck Field would continue to be used for academic instruction, competitive athletics, and rentals; however, Sherbeck Field is proposed to host competitive football games, which are currently held at other locations. The inclusion of field lighting as part of the project would allow Fullerton College to add more evening classes, to offer a balanced schedule, and provide more class options for students who may not be able to take physical education during the day.

Project Data

Funding Source: Other Funds

Budget: $4,600,000

Architect: Westberg White Architecture

Delivery Method: Design-Bid-Build

Status: Completed

New Instructional Building - Humanities (2400)

Project Overview

The building will help meet campus growth needs with the goal of consolidating an instructional division into a single building. The building will accommodate more than 40 classrooms and the division office services including staff offices. Scope of work for this projects includes the expansion of the Central Plant.

Project Data

Funding Source: Measure J & Local Funds

Budget: $14,758,944

Design Builder: BNBuilders, Inc and Roesling Nakamura Terada Architects, Inc.

Delivery Method: Progressive Design-Build

Square Footage: 22,300 GSF

Status: In Construction

Photo Gallery

Central Plant Expansion (CP-1)

Project Overview

Replacement and expansion of the Central Plant to accommodate planned new facilities and renovations and improve efficiency in servicing existing buildings. Project includes the replacement and expansion of the existing central plant to accommodate for three 600-ton high efficiency water chillers and cooling towers.

Project Data

Funding Source: Measure J

Budget: $10,600,000

Design Builder: BNBuilders, Inc and Roesling Nakamura Terada Architects, Inc.

Delivery Method: Progressive Design-Build

Square Footage: 2,028 GSF

Status: Substantially Complete 8/13/2021

Photo Gallery

Electric Vehicle Charging Stations

Project Overview

Fullerton College partnered with Southern California Edison’s ChargeReady program to install 44 additional Level 2 EV electric vehicle charging ports in the Lemon Parking Structure, bringing the campus total for EV charging to 50 ports.

Project Data

Funding Source: Southern California Edison

Sewer Line Replacement to Buildings 300 & 500

Project Overview

Design and construction for a new sewer line leading out of Building 300, and a new sewer line leading out of Building 500, as the existing lines are not functioning properly. The new sewer lines will travel from the existing buildings to the new saddle points of connection at the City of Fullerton’s sanitary sewer line, which is located on North Lemon Street.

Project Data

Funding Source: Measure J & Scheduled Maintenance

Budget: $690,705

Architect: R2A Architects

General Contractor: Los Angeles Engineering, Inc.

Delivery Method: Design-Bid-Build

Status: Complete