COMPLETED PROJECTS
Sherbeck Field Improvement
Sherbeck field completed bleacher and lighting installation rendering used for EIR draft published May 15, 2019. Source: GLR Group, 2018.
Project Overview
The proposed project encompasses the installation of permanent prefabricated aluminum bleachers, six field lighting stanchions, a new sound system, press box and storage building at the existing Sherbeck Field. Sherbeck Field would continue to be used for academic instruction, competitive athletics, and rentals; however, Sherbeck Field is proposed to host competitive football games, which are currently held at other locations. The inclusion of field lighting as part of the project would allow Fullerton College to add more evening classes, to offer a balanced schedule, and provide more class options for students who may not be able to take physical education during the day.
Project Data
Funding Source: Other Funds
Budget: $4,600,000
Architect: Westberg White Architecture
Delivery Method: Design-Bid-Build
Status: Completed
New Instructional Building - Humanities (2400)
Project Overview
Project Data
Funding Source: Measure J & Local Funds
Budget: $14,758,944
Design Builder: BNBuilders, Inc and Roesling Nakamura Terada Architects, Inc.
Delivery Method: Progressive Design-Build
Square Footage: 22,300 GSF
Status: In Construction
Photo Gallery
Central Plant Expansion (CP-1)
Project Overview
Project Data
Funding Source: Measure J
Budget: $10,600,000
Design Builder: BNBuilders, Inc and Roesling Nakamura Terada Architects, Inc.
Delivery Method: Progressive Design-Build
Square Footage: 2,028 GSF
Status: Substantially Complete 8/13/2021
Photo Gallery
Electric Vehicle Charging Stations
Project Overview
Fullerton College partnered with Southern California Edison’s ChargeReady program to install 44 additional Level 2 EV electric vehicle charging ports in the Lemon Parking Structure, bringing the campus total for EV charging to 50 ports.
Project Data
Funding Source: Southern California Edison
Sewer Line Replacement to Buildings 300 & 500
Project Overview
Project Data
Funding Source: Measure J & Scheduled Maintenance
Budget: $690,705
Architect: R2A Architects
General Contractor: Los Angeles Engineering, Inc.
Delivery Method: Design-Bid-Build
Status: Complete